Port Overview

Port Out-loading 

The iron ore will be transported to the jetty from the port stockyards by 13kms of overland conveyor, operating up to 11,500 tonnes per hour again typical of those used in iron ore operations in the Pilbara. The conveyor will cross the inter-tidal zone atop of an 8.6km rock armoured causeway. The causeway is designed to be 12.5m wide to accommodate an access roadway and out loading conveyor.